200 mln EUR na transport
|
AUSTRIA
|
Single country actions
|
Priority 1:
Freight Terminal Wolfurt –Planning (2011-AT-91124-S – €4,365,000)
Linz Trimodal (2011-AT-91153-P – €3,374,000)
Priority 3:
TEN-T Priority Project 17: Salzburg-Vienna section, high speed extension of the Westbahn – closing the gap east of Amstetten station (2011-AT-93051-P – €4,841,000)
TEN-T Priority Project 17: Salzburg-Vienna section, high speed extension of the Westbahn – Lambach-Breitenschutzung line improvements and works (2011-AT-93059-P – €2,792,000)
TEN-T Priority Project 17: Salzburg-Vienna section, high speed extension of the Westbahn – works for the St. Polten freight train pass (2011-AT-93108-P – €5,000,000)
|
Multi-country actions involving Austria
|
Priority 3:
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
|
|
BELGIA
|
Single country actions
|
Priority 1:
Liège Carex: studies for railport construction at Liège Airport (2011-BE-91083-S – €1,100,000)
Priority 3:
The Albert Canal: lifting of bridges and upgrading to class VIb (2011-BE-93067-P – €3,342,000)
Increase of under bridge-clearance on the Walloon section of Seine-Scheldt (Priority Project 30) waterway network in order to allow continuous passage of containerships with up to three layers (2011-BE-93072-P – €818,000)
Additional studies in the Seine-Scheldt network in Flanders (2011-BE-93073-S – €2,275,000)
Second sea lock Waaslandhaven (Port of Antwerp) (2011-BE-93077-P – €5,000,000)
Upgrade of the 10,000 tonne-section of the Brussels-Scheldt sea canal near Willebroek, to improve its accessibility for sea-going vessels (2011-BE-93105-P – €1,700,000)
|
Multi-country actions involving Belgium
|
Priority 2:
HIT (2011-EU-92130-S – €3,468,000)
Priority 3:
Planning study for a new maritime lock in Terneuzen (2011-EU-93076-S – €3,925,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
Priority 5:
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2 (2011-EU-95088-S – €1,300,000)
Preparatory studies and activities of the Rail Freight Corridor 8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015 (2011-EU-95090-S – €1,660,000)
|
|
BUŁGARIA
|
Multi-country actions involving Bulgaria
|
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Priority 5:
Sea2Sea: Developing a multimodal freight corridor to connect the Aegean to the Black Sea (2011-EU-95011-S – €750,000)
|
|
CZECHY
|
Single country actions
|
Priority 4:
Public-Private Partnership project D3 in south Bohemia region (2011-CZ-94064-S – €728,000)
|
Multi-country actions involving Czech Republic
|
Priority 3:
|
|
DANIA
|
Single country actions
|
Priority 3:
Detailed planning phase studies of removing the bottleneck of the railway section between Vamdrup and Vojens (2011-DK-93109-S – €5,000,000)
First phase of detailed planning studies – programme phase – for upgrading the railway access lines to the future Fehmarn Belt fixed link – from Ringsted to Roedby (2011-DK-93122-S – €5,000,000)
|
Multi-country actions involving Denmark
|
Priority 2:
HIT (2011-EU-92130-S – €3,468,000)
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
|
|
ESTONIA
|
Multi-country actions involving Estonia
|
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
|
|
FINLANDIA
|
Single country actions
|
Priority 3:
E18 Hamina by-pass road (2011-FI-93118-P – €4,400,000)
Improving of punctuality/reliability of passenger train traffic (2011-FI-93125-S – €5,000,000)
|
Multi-country actions
involving Finland
|
Priority 2:
Make a Difference (2011-EU-92079-S – €1,247,000)
|
|
FRANCJA
|
Single country actions
|
Priority 1:
Study for the creation of the intermodal platform Seine-Metropole Port, on the Seine River (2011-FR-91070-S – €1,050,000)
Preliminary studies for the development of four multimodal platforms Canal Seine-Nord Europe &their road and rail connections (2011-FR-91084-S – €2,200,000)
Priority 2:
Technical and design studies concerning the implementation of a LNG (Liquefied Natural Gas) bunkering station at the port of Dunkirk (2011-FR-92026-S – €1,150,000)
Priority 3:
Design and environmental studies to improve the efficiency of port of Dunkirk’s railway system regarding the TEN-T hinterland connection (2011-FR-93025-S – €1,152,000)
Lyon region rail bypass – preliminary studies (2011-FR-93047-S – €2,889,000)
Project-level studies and archaeological excavations of the 2nd phase of the Rhine-Rhone Eastern Branch (2011-FR-93054-S – €5,000,000)
Priority 4:
Construction of the Nimes and Montpellier stations on the new mixed high speed line of the Nimes and Montpellier (NJC) bypass (2011-FR-94036-S – €2,150,000)
|
Multi-country actions involving France
|
Priority 2:
HIT (2011-EU-92130-S – €3,468,000)
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
Priority 5:
Consolidation and strengthening of the corridor Upper Rhine as a central hub for the TEN-T network (2011-EU-95029-S – €850,000)
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2 (2011-EU-95088-S – €1,300,000)
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with EU Regulation No. 913/2010 (2011-EU-95093-S – €1,692,000)
EU Regulation No. 913/2010, concerning a European Rail Network for competitive freight: Implementation of Rail Freight Corridor 4 (2011-EU-95107-S – €1,070,000)
|
|
NIEMCY
|
Single country actions
|
Priority 3:
VDE (Verkehrsprojekt der Deutschen Einheit) 8.1, 4-track extension of the Eltersdorf-Paul Gossenstraße section (2011-DE-93033-P – €5,000,000)
Design studies regarding a two-lane railway bridge to improve the port access to the TEN-T Network (2011-DE-93115-S – €2,940,000)
|
Multi-country actions involving Germany
|
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Priority 5:
Consolidation and strengthening of the corridor Upper Rhine as a central hub for the TEN-T network (2011-EU-95029-S – €850,000)
Preparatory studies and activities of the Rail Freight Corridor 8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015 (2011-EU-95090-S – €1,660,000)
|
|
GRECJA
|
Single country actions
|
Priority 3:
Remaining studies to complete the upgrading of the main rail axis Athens-Thessaloniki in the section Athens R.S.
(km 9+700 ) –Aharnes Attica (km 22+300) (2011-EL-93020-S – €1,000,000) |
Multi-country actions involving Greece
|
Priority 3:
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
Priority 5:
Sea2Sea: Developing a multimodal freight corridor to connect the Aegean to the Black Sea (2011-EU-95011-S – €750,000)
|
|
WĘGRY
|
Multi-country actions involving Hungary
|
Priority 5:
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with EU Regulation No. 913/2010 (2011-EU-95093-S – €1,692,000)
|
|
IRLANDIA
|
Multi-country actions involving Ireland
|
Priority 2:
International Green Electric Highways – Study to assess fast charging infrastructure to enable deployment of electric vehicles in Ireland and Northern Ireland (2011-EU-92145-S – €2,119,000)
|
|
WŁOCHY
|
Single country actions
|
Priority 3:
Treviglio AV/AC section –Civil engineering works: Brescia (2011-IT-93095-P – €5,000,000)
Genoa rail node: improvement of the traffic management systems (2011-IT-93096-P – €5,000,000)
Turin-Padua: technological improvements to the efficiency of the Milan railway junction (2011-IT-93097-P – €5,000,000)
Bologna AV/AC rail node: construction of a rail section between the node and the Venice line to streamline traffic (2011-IT-93098-P – €2,229,000)
Priority 4:
Implementation study to prepare a PPP to improve the capacity of the port of Venice and related logistics system (2011-IT-94006-S – €770,000)
PPP 'MXPT2LINK-UP’ (2011-IT-94030-S – €524,000)
|
Multi-country actions involving Italy
|
Priority 2:
Green technologies and eco-efficient alternatives for cranes &operations at port container terminals (GREENCRANES) (2011-EU-92151-S – €1,844,000)
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
Priority 5:
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with EU Regulation No. 913/2010 (2011-EU-95093-S – €1,692,000)
|
|
ŁOTWA
|
Single country actions
|
Priority 3:
Preliminary Design of Latvian Railway Network Electrification (2011-LV-93133-S – €1,419,000)
|
|
LITWA
|
Multi-country actions involving Lithuania
|
Priority 5:
Preparatory studies and activities of the Rail Freight Corridor 8 organisational structures Bremerhaven/Rotterdam/Antwerp- Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015 (2011-EU-95090-S – €1,660,000)
|
|
LUKSEMBURG
|
Multi-country actions involving Luxembourg
|
Priority 5:
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2 (2011-EU-95088-S – €1,300,000)
|
|
HOLANDIA
|
Single country actions
|
Priority 1:
Realisation of the most sustainable container terminal in Europe which will increase intermodal transport between the Port of Rotterdam and the European Hinterland (2011-NL-91116-P – €5,000,000)
Priority 3:
Freight corridor Betuweroute-southeast Netherlands-Germany (Corridor I) (2011-NL-93022-S – €3,750,000)
Elimination bottleneck north-south artery A2 (E25): An urban highway tunnel as a solution for safety and integrating lower carbon transport infrastructure in Maastricht (2011-NL-93042-P – €5,000,000)
Implementation study eliminating the major bottlenecks in the Amsterdam-Rotterdam-Antwerp corridor (2011-NL-93112-S – €2,147,000)
Priority 4:
Preparations to develop Public-Private Partnership (DBFM) during realisation of the Beatrix locks and the Lekkanaal (Amsterdam-Rotterdam-Antwerp corridor) (2011-NL-94111-S – €912,000)
|
Multi-country actions involving The Netherlands
|
Priority 2:
HIT (2011-EU-92130-S – €3,468,000)
Priority 3:
Planning study for a new maritime lock in Terneuzen (2011-EU-93076-S – €3,925,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
Priority 5:
Studies, managerial structures and activities for the establishment of Rail Freight Corridor 2 (2011-EU-95088-S – €1,300,000)
Preparatory studies and activities of the Rail Freight Corridor 8 organisational structures Bremerhaven/Rotterdam/Antwerp-Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015 (2011-EU-95090-S – €1,660,000)
|
|
POLSKA
|
Single country actions
|
Priority 1:
Extension of Deepwater Container Terminal in Gdańsk (2011-PL-91128-P – €1,776,000)
Priority 3:
Modernisation of rail section Warszawa Włochy-Grodzisk Mazowiecki: preparatory studies (2011-PL-93141-S – €1,379,000)
|
Multi-country actions involving Poland
|
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Priority 5:
Preparatory studies and activities of the Rail Freight Corridor 8 organisational structures Bremerhaven/Rotterdam/Antwerp- Aachen/Berlin-Warsaw-Terespol (Poland-Belarus border)/Kaunas for the corridor to become operational by 10 November 2015 (2011-EU-95090-S – €1,660,000)
|
|
PORTUGALIA
|
Multi-country actions involving Portugal
|
Priority 5:
EU Regulation No. 913/2010 concerning a European Rail Network for competitive freight: Implementation of rail freight corridor Nr 4 (2011-EU-95107-S – €1,070,000)
|
|
RUMUNIA
|
Single country actions
|
Priority 1:
Studies for intermodal transport infrastructure development for passenger &freight at Cluj-Napoca International Airport (2011-RO-91018-S – €1,000,000)
|
Multi-country actions involving Romania
|
Priority 3:
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
|
|
SŁOWENIA
|
Multi-country actions involving Slovenia
|
Priority 2:
Green technologies and eco-efficient alternatives for cranes &operations at port container terminals (GREENCRANES) (2011-EU-92151-S – €1,844,000)
Priority 5:
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with EU Regulation No. 913/2010 (2011-EU-95093-S – €1,692,000)
|
|
HISZPANIA
|
Single country actions
|
Priority 1:
Remodelling of the Aranjuez Intermodal and Logistics Centre -1st phase of works (2011-ES-91113-P – €1,059,000)
Priority 2:
Gas as an Alternative for Road Transport –GARneT (2011-ES-92136-S – €1,936,000)
Blue Corridors enhance through the Application of Natural Gas Energy (2011-ES-92138-S – €1,108,000)
Priority 3:
Works on the platform subsection Venta de Baños Link: Valladolid-Burgos &Leon-Palencia- Burgos – connections and services for follow up works (2011-ES-93091-P – €5,000,000)
Works on the platform subsection Durango – Amorebieta/Etxano and services for follow up works (2011-ES-93094-P – €4,198,000)
Platform Works and services for follow-up works on subsection Amorebieta/Etxano-Amorebieta/Etxano (2011-ES-93101-P – €3,275,000)
Works on the platform subsections Amorebieta/Etxano-Lemoa and Lemoa–Galdakao (2011-ES-93104-P – €4,806,000)
Adaptation of the Port of Barcelona railway network to standard (UIC) gauge (2011-ES-93137-P – €1,000,000)
Priority 4:
Intermodal logistics platform: Vilamalla/El Far d’Emporda. Public-Private Partnership as the formula to develop (2011-ES-94123-S – €548,000)
|
Multi-country actions involving Spain
|
Priority 2:
Green technologies and eco-efficient alternatives for cranes &operations at port container terminals (GREENCRANES) (2011-EU-92151-S – €1,844,000)
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
Priority 5:
EU Regulation No. 913/2010 concerning a European Rail Network for competitive freight: Implementation of Rail Freight Corridor 4 (2011-EU-95107-S – €1,070,000)
Studies, managerial structures and activities for the establishment of the Rail Freight Corridor 6 in line with EU Regulation No. 913/2010 (2011-EU-95093-S – €1,692,000)
|
|
SZWECJA
|
Single country actions
|
Priority 2:
Fjalir project (2011-SE-92148-P – €261,000)
Priority 3:
Bothnian Corridor – East Coast Line – increased capacity. Study new line Stangan-Dingersjo (2011-SE-93035-S – €1,356,000)
Bothnian Corridor -East Coast Line – increased capacity meeting stations (2011-SE-93045-P – €2,292,000)
Western link – railway tunnel in Gothenburg (2011-SE-93049-S – €4,996,000)
Upgrading of maritime infrastructure in the Lake Malaren (2011-SE-93090-S – €2,760,000)
Stockholm Bypass, tunnel safety studies (2011-SE-93119-S – €1,400,000)
|
Multi-country actions involving Sweden
|
Priority 2:
Make a Difference (2011-EU-92079-S – €1,247,000)
HIT (2011-EU-92130-S – €3,468,000)
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
|
|
WIELKA BRYTANIA
|
Single country actions
|
Priority 1:
Southampton Port to West Coast Main Line: Rail freight upgrade and hinterland connections (2011-UK-91055-P – €5,000,000)
Priority 3:
York Street Inter-change – Improvement to Belfast Port Hinterland Connections (2011-UK-93016-S – €1,260,000)
Removing a bottleneck on the Northern Ireland rail network: Coleraine –Derry (2011-UK-93021-P – €1,615,000)
Priority Project 26: Felixstowe to Nuneaton rail freight enhancement, Ely Loops (2011-UK-93050-P – €4,000,000)
Priority Project 26: North West England Electrification, Manchester-Liverpool (2011-UK-93069-P – €5,000,000)
|
Multi-country actions involving the UK
|
Priority 2:
International Green Electric Highways – Study to assess fast charging infrastructure to enable deployment of electric vehicles in Ireland and Northern Ireland (2011-EU-92145-S – €2,119,000)
Priority 3:
Air Navigation Service Providers (ANSPs) coordination within Interim Deployment Steering Group (IDSG) (2011-EU-93005-S – €1,814,000)
Air traffic management network integration and performance enhancement acceleration (2011-EU-93129-P – €3,864,000)
|